c est bon! Jicable – International Conference on Insulated Power Cable Systems

2023-C2 - Development tests, evaluation, prequalification tests, type tests, acceptance and after installation tests 2

2023-C2-1

PDF Laboratory Study of the Impact of Repeated VLF Withstand Test and Subsequent AC Operation on Service-Aged Cables

HAMPTON Nigel UL Solutions USA

PERKEL Josh EPRI, USA

RILEY Caryn, HERNANDEZ JC NEETRAC USA

ALTAMIRANO Jorge CME/Viakable USA

2023-C2-2

PDF Feedback on cable system testing ²from recent offshore projects

COILLOT Antoine RTE, France

2023-C2-3

PDF Special qualification and characterization tests on 525 kV HVDC submarine cable system

PIETRIBIASI Davide, BERARDI Grazia, FRANCHINI Alberto Prysmian Group, Italy

2023-C2-4

PDF Widescale VLF Testing Statistics over the Last Decade at Westnetz GmbH

SCHRÖDER Andreas, NEUSER Maik, NAGELSCHMIDT Mike Westnetz GmbH, Germany

PUTTER Hein, PROBST Robert Megger Germany GmbH, Germany

2023-C2-5

PDF Experience of development tests on connectors for large conductors according to the CIGRE TB 758 test sequence

MIREBEAU Pierre, AIT AMAR Abdellatif NEXANS, France

AUE Volker Nexans, Germany