2007-A6 - HV and EHV Cables - Operating considerations
2007-A6-1
FACTS for optimum utilisation of cable networks in power systems
GRÃNBAUM Rolf - ABB Power Technologies AB Vasteras, Finland
KARLSTRAND Johan - ABB Power Systems Karlskrona, Sweden
2007-A6-2
Outsourcing preventive maintenance on underground power transmission cables
ALSHIBANI Salem M. - Cable Maintenance Section Head, Ministry of Energy Yarmouk, Kuwait
SHARAF Ahmad - Senior Consulting Cable Engineer, Ministry of Energy Yarmouk, Kuwait
2007-A6-3
Failure prediction in 50 kV mass-insulated power cable systems
JONGEN Rogier A., MORSHUIS Peter H. F., SMIT Johan J. - Delft University of Technology Delft, The Netherlands
JANSSEN Anton L.J. - Continuon Assetmanagement Arnhem, The Netherlands
GULSKI Edward - Ksandr Delft, The Netherlands
2007-A6-4
Fire hazard of MV / HV cables installed in tunnels
PHILIPPCZYK Christian - NKT Cables GmbH Köln, Germany
VENO-POULSEN Keld - NKT Cables A/S Asneas, Denmark
JOURNEAUX Terry, GRACIAS Doug - Prysmian Cables & Systems Eastleigh, United Kingdom
LOYENS Wendy - Borealis AB Stenungsund, Sweden
ROBINSON James - Borealis Polymers NV Mechelen, Belgium
2007-A6-5
Dynamic rating systems in general and in a hybrid 150 kV transmission system
DE WILD Frank H., BOONE Wim - KEMA Consulting Arnhem, The Netherlands
Van DER GEEST Hans - CONTINUON The Netherlands
SMIT Jacco - Nuon Tecno Alkmaar, The Netherlands