2011-A8 - Testing methods - Factory and after laying tests
2011-A8-1
A measuring system of conductor AC and DC resistance
Karl-Erik RYDLER - SP Technical Research Institute of Sweden
Mats SJOBERG, Jorgen SVAHN - ABB AB
2011-A8-2
Advanced measurement of AC resistance on skin-effect reduced large conductor power cables
Ronald PLATH - Ing.-Büro HPS Berlin
Gero SCHROEDER, Johannes KAUMANNS - Suedkabel GmbH
2011-A8-3
New generation of on-site testing technology for transmission power cables
Rogier JONGEN, Paul SEITZ, Ben QUAK - Seitz Instruments AG
Frank De VRIES - Liandon BV
Piotr CICHECKI - Delft University of Technology
2011-A8-4
A new approach for testing long HV and UHV cables
Peter MOHAUPT, Tobias MEHL - Mohaupt High Voltage GmbH
2011-A8-5
Alternatives for HVAC testing of long HV cables in the factory and on-site
Frank SCHREITER, Stefan SCHIERIG, Peter COORS - HIGHVOLT Prüftechnik Dresden GmbH
2011-A8-6
ZHAO Jiankang, OUYANG Benhong, RAO Wenbin, LI Wenjie, XIA Rong - State Grid Electric Power Research Institute