2019-D8 - Risk Assessment and management of cable systems
2019-D8-1
 Risk management in the presence of partial discharges in HV joints by means of periodic monitoring
 Risk management in the presence of partial discharges in HV joints by means of periodic monitoring
BALZA Xabier - Prysmian Group Barcelona, Spain
2019-D8-2
 Challenges of cable engineering from offshore to onshore and project to operation
 Challenges of cable engineering from offshore to onshore and project to operation
ZHANG Dr. Roland Dongping, FREITAG Dr. Christian, WAGNER Dr. André - TenneT TSO GmbH Bayreuth, Germany
2019-D8-3
 Quality Control of HVDC Cables - The next industry challenge
 Quality Control of HVDC Cables - The next industry challenge
JEROENSE Marc - MJ MarCable Consulting AB Karlskrona, Sweden
2019-D8-4
 Enhanced Overvoltage Protection for Reliability beyond the First Decade
 Enhanced Overvoltage Protection for Reliability beyond the First Decade
HUMMEL Rene - IMCORP Berlin, Germany
WALLACE Michael - Duke Energy Raleigh, USA
LANZ Ben, SHANNON Charles, ZIEGLER Steffen Ziegler - IMCORP Manchester, CT, USA
2019-D8-5
DREWS Anja, MCCALL Rachel, ZYMELKA Antony - European Subsea Cable Association Guisborough, United Kingdom
2019-D8-6
KHONDKER Raihan - South Texas Project Nuclear Operating Company Bay City, USA
BANERJEE Sarajit, EASTERLING Rick, ROUISON David - Kinectrics Inc. Toronto, Canada
