WETS’07 WORKSHOP
World Energy Transmission System
Achievement and experience in service of long length (> 10 km), HV, EHV electrical links by AC insulated power cables
PARIS La Défense June 28th 2007
PROGRAM
by Lucien Deschamps, chairman of the Organization Committee
by Aldo Bolza
MORNING SESSIONS :
Chairman : Susumu Sakuma, Viscas corporation, Japan
Rapporteur : Christian Aucourt, RTE, France
(see the morning session report)
Introduction to the technical discussions
“Synthesis of the world survey made by Jicable on long length HV electrical links by insulated cables” by Frédéric LESUR, EDF-R&D, France
Session 1 - Long length links in the world
- Characteristics (topic 1)
Session 2 - Long length links in the world
- Compensation of the reactive power (topic 2)
AFTERNOON SESSIONS :
Chairman : Juan Prieto Monterrubio, REE, Spain
Rapporteur : Christian Remy, Prysmian, France
(see the afternoon session report)
Session 3 - Long length links in the world
Session 4 - Long length links in the world
- Evolution of the technical and economical performances (topic 5)
- Prospect of development in the world of new long length HV links by insulated power cables (topic 6)
by Aldo Bolza