2019 - JICABLE'19 - 10th International Conference on Power Insulated Cables

2007-A3 - Cables for the future

2007-A3-1

pdf  Superconducting cables - status and applications

SAUGRAIN Jean-Maxime  -  Nexans France Clichy, France

SCHMIDT Frank  -  NEXANS GmbH&Co.KG Hannover, Germany

MIREBEAU Pierre  -  Nexans France Calais, France

2007-A3-2

pdf  Installation and commissioning of TRIAX HTS cable

JINDSAY David T., RODEN Mark, DENMON Randy  -  Southwire Company Carrollton, USA

WILLEN Dag  -  nkt cables Denmark

MEHRABAN Ben, KERI Albert  -  American Electric Power USA

2007-A3-3

pdf  Installing a long-distance HTS cable

GESCHIERE Alex, PIGA Erika  -  Nuon Duiven, The Netherlands

WILLEN Dag  -  nkt cables Brondby, Denmark

BARENDREGT Peter  -  nkt cables Köln, Germany

ALBAUGH Kevin  -  Praxair Danbury, USA

2007-A3-4

pdf  Development and demonstration of a long length transmission voltage cold dielectric superconducting cable to operate in the Long Island Power Authority grid

SCHMIDT Frank  -  NEXANS GmbH&Co.KG Hannover, Germany

MAGUIRE James  -  American Superconductor Westborough, USA

BRATT Shawn  -  AIR LIQUIDE DTA Sassenage, France

WELSH Tom  -  Long Island Power Authority Hicksville, USA

LALLOUET Nicolas  -  Nexans France Calais, France

2007-A3-5

pdf  Potential of multilayer coating for gas insulated dielectric withstand improvement

HAIROUR Mounir, BESSEDE Jean-Luc  -  AREVA T&D Villeurbanne, France

MIKES Endre  -  AREVA T&D AG

TOUREILLE Alain, AGNEL Serge, NOTINGHER Petru, CASTELLON Jérôme  -  IES-GEM UM2 France

2007-A3-6

pdf  Gas insulated transmission lines - underground power transmission achieving a maximum of operational safety and reliability

KUNZE Dirk, PÖHLER Stephan, ALTER Joachim  -  Siemens AG Erlangen, Germany

BINDER Erich, TÜRK Jürgen  -  VERBUND Austrian Hydro Power Salzburg, Austria


© 2015 JICABLE
& SEE