2019 - JICABLE'19 - 10th International Conference on Power Insulated Cables

2011-C10 - Cable installation

2011-C10-1

pdf  Investigation into the benefits of installing high operating temperature cables in tunnels

James PILGRIM, David SWAFFIELD, Paul LEWIN  -  University of Southampton

Steve SWINGLER  -  Southampton Dielectric Consultants

Francis WAITE, David PAYNE  -  National Grid

2011-C10-2

pdf  A new backfill material with an extremely high thermal conductivity

Raymund BÖING  -  Heidelberg Beton

Hans-Peter MAY  -  nkt cables GmbH

Joerg DIETRICH  -  HeidelbergCement Geotechnik

Heinrich BRAKELMANN, Joerg STAMMEN  -  University Duisburg-Essen

2011-C10-3

pdf  Backfill replacement saves underground transmission lines cost and postpones investments

Athayde MACEDO, Carla DAMASCENO  -  Ligth SESA

Geraldo de ALMEIDA, Luis ZANETTA  -  University of Sao Paolo - USP

2011-C10-4

pdf  Improved cooling of high voltage cables

Herbert NYFFENEGGER, Detlef WALD  -  Brugg Kabel AG

Harry ORTON  -  Orton International Consulting

2011-C10-5

pdf  Hybrid high capacity transmission circuits - Challenges for cables in series with EHV overhead lines

Simon LLOYD  -  Cable Consulting International

Glenn STAPLETON  -  Powerlink Queensland


© 2015 JICABLE
& SEE