2019 - JICABLE'19 - 10th International Conference on Power Insulated Cables

2015-E1 - Economics of cable systems

2015-E1-1

pdf  Electrothermal coordination in cable based transmission grids operated under market based conditions

OLSEN Rasmus, RASMUSSEN Carsten  -  Energinet.dk Fredericia, Denmark

HOLBOELL Joachim  -  Technical University of Denmark Kgs. Lyngby, Denmark

GUDMUNDSDOTTIR Unnur Stella  -  Dong Energy Fredericia, Denmark

2015-E1-2

pdf  Copper or aluminium cable conductors, broadly compared in a life-cycle perspective

BOONE Wim, KACKER Arnav, BAL Remco  -  DNV GL Arnhem, Gelderland, The Netherlands

2015-E1-3

pdf  Operating a 10 kV cable on a system voltage of 20 kV: the long term test

SMIT Jacco, DE VRIES Frank, SEBREGTS Ger  -  Alliander Arnhem, The Netherlands

BOONE Wim  -  DNV GL Arnhem, The Netherlands

2015-E1-4

pdf  Cable selection challenges

BALLOUR Sami, ALHAMMADI Khadija  -  DUCAB Dubai, United Arab Emirates

2015-E1-5

pdf  Efficient project management of high voltage underground cable systems against self-evident facts

DUBREUIL Michel, POMBOURCQ Hervé  -  RTE Paris, France

2015-E1-6

pdf  The use of life cycle cost analysis to determine the most effective cost of installation 500 kV of Java-Sumatra power interconnection system

NUGRAHA Herry, SILALAHI Zivion  -  PLN Indonesia Jakarta, Indonesia

SINISUKA Ngapuli  -  ITB, School of Electrical Engineering and Informatics Bandung, Indonesia


© 2015 JICABLE
& SEE