2019 - JICABLE'19 - 10th International Conference on Power Insulated Cables

2015-E6 - Technical challenges

2015-E6-1

pdf  Progress control in the context of the project management for the execution of a 320 kV HVDC land cable project - Dolwin 2

EBERT Sebastian, BORN Johann  -  ABB AG Mannheim, Baden Württemberg, Germany

2015-E6-2

pdf  Integration of an 88 km 220 kV AC cable into the Victorian electricity network in Australia

MCMILLAN Lee, JANJIC Miron  -  Beca Pty Ltd. Melbourne, Victoria, Australia

CHRISTMAS Ian  -  Beca Pty Ltd. Brisbane, Australia

2015-E6-3

pdf  HVDC & HVAC cable systems delivered on long length drums

SANTANA José, MICHON Franck, MANSOUR Jawdat  -  Prysmian Group Gron, France

MIREBEAU Pierre, ADAM Dominique  -  Nexans Calais, France

MAMMERI Mohamed, DHUICQ Bernard  -  General Cable Montereau-Fault-Yonne, France

BAIL Roland  -  SYCABEL Paris, France

LESUR Frédéric  -  RTE Paris, France

2015-E6-4

pdf  Cable quality assurance of offshore projects in the German North Sea

ZHANG Roland Dongping, WERLE Volker, JUNG Jochen  -  TenneT TSO GmbH Bayreuth, Germany

2015-E6-5

pdf  Cable constraints due to background harmonic amplifications

FILLION Yannick, DESCHANVRES Simon, BOUDINET Nathalie  -  RTE Paris, France

2015-E6-6

pdf  Watertight cable designs in hydropower generation plants

SIVERTSVOLL Børre Johansen, RØNNINGEN Terje  -  Siemens AS Trondheim, Norway

FAREMO Hallvard, LERVIK Jens Kristian  -  SINTEF Energy Research Trondheim, Norway

HØNSI Kåre, WILNES Rolf  -  Statkraft Energi AS Oslo, Norway

HALVORSON Hans Lavoll, JACOBSEN Ole Kristian  -  BKK Nett AS Bergen, Norway


© 2015 JICABLE
& SEE