2023-D3 - Laying methods

2023-D3-1

pdf  A pilot using water pressure to install 2 150 kV cable circuits in a horizontal directional drilling

SMIT Jacco, ZUIJDERDUIN Roy  -  TenneT T.S.O., The Netherlands

GRIFFIOEN Willem  -  Plumettaz SA, The Netherlands

2023-D3-2

pdf  Calculation of forces in cable during installation in pipes for different methods

GRIFFIOEN Willem, PLUMETTAZ Damien, NAULA Valery  -  Plumettaz SA, Switzerland

2023-D3-3

pdf  High Power Cable Corridors

MAMPAEY Bart  -  ELIA, Belgium

SARENS Mario, VAN DER AUWERA Wannes  -  Elia-Engineering, Belgium

2023-D3-4

pdf  Water Propulsion Cable Laying and Non-destructive Commissioning of Power Cables

PARCIAK Jaroslaw  -  onsite hv solutions central Europe Sp. z .o.o., Warsaw, Poland

GULSKI Edward  -  Lodz University of Technology, Poland

PARCIAK Robert  -  power arbor Sp. z .o.o., Warsaw, Poland